« Back Record Document

Mojolka Hydroelectric Project. Phase I - Review of Prefeasibility Report.

Noviembre 1982

11.5-2 Reg.0074

Site Selection; Hydrology; Geotechnical Aspects; Environmental Aspects; Layout Studies at The Boboke Site;Transmission System Studies; Cost Estimates and Scheduling;Power Potential and Optimization; Load Forecast; Economic and Financial Aspects.

Ministerio de Energía y Minas - Centro de Documentación

Marjorie Montiel

Hospital Bautista, 1 C. Este, 1 Cuadra al Norte. Managua

2280-9500 al 09

De Lunes a Viernes de las 8:00am - 5:00pm.

Desarrollado por: Aikyu-Systems