Authors

A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
Result - 67 Documents
Showing:

La Sirena Hydropower Project, Feasibility Studies. Tender Design and Tender Document. Feasibility Report Drillcore and Sample Phothographs

Norconsult International Norway; Swedpower AB Sweden;

La Sirena Hydropower Project-Project Document

Swedpower AB Sweden;

Rio Viejo-Master Plan, Montegrande Feasibility Study Phase 1 Report

Norconsult International Norway; Swedpower AB Sweden;

Master Plan for Rio Viejo, Irrigation Study.

Norconsult International Norway; Swedpower AB Sweden;

Master Plan Prefeasibility Study of Lower Rio Viejo: Final Report.

Norconsult International Norway.; Swedpower AB Sweden;

La Sirena Hydropower Project - Feasibility Study Final Report: Vol.3 - Environmental Impact Assessment.

Norconsult International Norway.; Swedpower AB Sweden;

Los Calpules Hydropower Plant - Tender Document. Contract 3 Mechanical Works.

Swedpower AB Sweden; Norconsult International Norway.;

Proyecto Río Viejo-Mater Plan. Final main Report: Volumen 18-Appendices Drawings

Norcuonsult International Norway; Swedpower AB Sweden;

La Sirena Hydropower Project-Feasibility Study Vol.1-Main Report-Draft

Swedpower AB Sweden; Norconsult International Norway;

Environmental and Socio Economic Impact Assessment of the Los Calpules and Montegrande Hydropower Projects-Draft Report

Swedpower AB Sweden; Norconsult International Norway;

Lower Rio Viejo-Prefeasibility Study. Interim Repor

Norconsult International Norway; Swedpower AB Sweden;

Proyecto Rio Viejo Master Plan - Volumen I Main Report.

Norconsult International Norway; Swedpower AB Sweden;

Proyecto Rio Viejo - Master Plan Seismological Study - Final Report.

Norconsult International Norway.; Swedpower AB Sweden;

La Sirena Hydropower Project. Feasibility Study: Addendum.

Norconsult International Norway.; Swedpower AB Sweden;

Los Calpules Hydropower Project - Tender Document. Contract 4 Generator.

Swedpower AB Sweden. Norconsult International Norway.;

Proyecto Rio Viejo-Master Plan Water Rights Study-Final Report

Norconsult International Norway; Swedpower AB Sweden;

Proyecto Rio Viejo-Master Plan. Executive Summary-Final Report

Norconsult International Norway; Swedpower AB Sweden;

Prefeasibility Study. Los Calpules 2-La Sirena-Desk Study

Norconsult International Norway; Swedpower AB Sweden;

Proyecto Rio Viejo-Los Calpules. Environmental and Socio Economic Impact Assessment of the Los Calpules Hydropower Project

Norconsult International Norway; Swedpower AB Sweden;

Proyecto Rio Viejo-Master Plan. Final main Report Volumen 1B-Appendices-Drawings.

Norconsult International Norway.; Swedpower AB Sweden;

Showing:
Cuaderno de Coyuntura 26: El litio y la crisis política en BoliviaView Record
Cuaderno de Coyuntura 25: Empresas chinas en Bolivia: Denuncias sobre derechos de los trabajadores y situación ambiental. Periodo 2015-2019View Record
Evaluación de la gestión de la ASADA de Santa Cristina, La Suiza, Turrialba, desde una perspectiva del uso sostenible del recurso hídricoView Record
Evaluación de la gestión de la ASADA de Jicotea, Tayutic, Turrialba, desde una perspectiva del uso sostenible del recurso hídricoView Record
Evaluación de la gestión de la ASADA de Alto Varas, La Isabel, Turrialba, desde una perspectiva del uso sostenible del recurso hídricoView Record
Código de Instalaciones Eléctricas de NicaraguaView Record
Apuntes para un manual técnico de diseño, estandarización y fabricación de equipos para pequeñas centrales hidroeléctricas. Turbinas Michell - BankiView Record
Economía ambiental : una introducción.View Record
Informe de estadísticas energéticas = Energy statistics report 2012View Record
Manual estadística energética 2017 = Energy statistics manual 2017View Record

Desarrollado por: Aikyu-Systems